National
Expansion of Abuja/Keffi expressway: Fashola gives fresh update
Mr Babatunde Fashola, the Minister of Works and Housing, has said that the ultimate objective of expanding the Abuja-Keffi Expressway was to reduce traffic congestion and travel time for commuters.
Fashola disclosed this on Tuesday while inspecting the expansion of the Abuja-Keffi, Akwanga-Makurdi Expressway.
He explained that the road would be constructed to international standards.
Fashola said, “It will be built to the quality of any road built in any country or other parts of the world. It’ll be a place where you will love to commute.
“Ultimately, the purpose is to make life better for those who use that axis, to reduce the travel time and to reduce the congestion around there.
“That’s essentially what we hope to achieve, and believe me, you will see when it is all done that it’ll make all the sacrifice worthwhile.”
Fashola said the residents of Mararaba-Nyanya would soon see that all the sacrifices they had to endure would be worthwhile, citing the Abuja Keffi Expressway as having attained 45.8 percent completion.
He also inspected the over 260 km Keffi =-Akwanga -Lafia – Makurdi highway project.
“The main purpose of the Akwanga to Makurdi highway, which we flagged off about two years ago, and is one of the roads being funded with the China EximBank loan, is very critical and strategic for linking the North Central to the North East, and from there to other parts of the country.
“For those who have issues about borrowing, they can come and see what the borrowing is being used for; all of the people who are working here would probably not have this job without that borrowing.
“Because we have a lot to do, we do not have enough to do them at the same time. So this’s part of the dualisation project construction of a brand new highway to complement the existing one.
“And the Reconstruction of the existing one. You will also see the diversions. This is how we build. We can not close up the road. We can not construct almost 300-km of the highway at once, so we do it in sections, “He said while announcing that the project was billed for completion in three years,” he stated.
-
World News6 days ago
Biden says ‘nobody can reverse’ his climate agenda. But Trump is poised to try.
-
Gist3 days ago
VIDEO: Congo’s president daughter’s bedroom video leaks
-
News7 days ago
Delta Assembly Approves Name Change for University of Science and Technology, Ozoro
-
News6 days ago
TrackNews Felicitates New NUJ Bayelsa State Exco
-
News5 days ago
NIMASA DG JOB: Gbajabiamila Allegedly Collected $1m Bribe From Victor Ochei, Others Paid $2m, $3m, Tinubu’s Man Akinyelure Fingered, ONI-Okpaku Arrested ___Jackson Ude
-
Politics3 days ago
Patani stands still as High Chief (Dr) Wayles honors his mother, remembering her legacy 5 years later.
-
Sports7 days ago
Ademola Lookman adds to Super Eagles withdrawals
-
Business6 days ago
JUST-IN: Auditor-General uncovers N3.4trn fraud