Featured
FG to apply for $11bn loan to construct Lagos-Calabar rail line — Amaechi
TRACKING____Minister of Transportation, Chibuike Amaechi, said, yesterday, that the Federal Government was set to apply for a $11billion loan to construct Lagos to Calabar rail.
Amaechi made the disclosur y during an interactive session with the South-East and South-South Professionals of Nigeria, SESSPN, in Lagos.
The group had taken advantage of the Minister’s presence in Lagos to hold talks with him on challenges facing the regions, particularly in the areas of security, power, social integration and representation in the President Muhammadu Buhari-led government.
Amaechi on why railway work was yet to commence in the South-East, said, “I hate tribalism. I’ve said this before. For me, I’m a Nigerian, and what informs my decision of choosing which rail line to construct at any point in time, is the economics of rail; and currently, the economics shows that Lagos to Kano has the capacity to move 30 million tonnes of cargo per year.
“I did same analysis for Port Harcourt to Maiduguri rail line and it’s 11 million tonnes. We are currently doing the analysis for Lagos to Calabar to know how many tonnes of cargo can be moved there per year. So, we started with the Lagos to Kano rail line. President Olusegun Obasanjo approved it, President Jonathan started construction on it by doing Abuja to Kaduna and President Buhari told us to complete all previous projects.
“Now, we are applying for $11billion loan to construct Lagos to Calabar rail. There was no design for Port Harcourt-Maiduguri. We knew that the first thing to do was to commence a feasibility study, after that, we’ll do the design. It’s now they’ll start to do the site drawing. In the next three months, they will be doing that, you’ll start shouting again: why are they not constructing? You forget that Ibadan to Kano, they are just finishing the design now, that’s why they’ve not started construction.
“The President told us that all rail lines in Nigeria must be standard gauge. So, we did a standard gauge design for the Port Harcourt-Maiduguri rail line. We went to Bonny to do the study and we did that study up to Maiduguri. I did a feasibility study that brought it between $14 billion to $11 billion.
“When we finished, we got approval from the President, but I realised that we may not get the money in this government. I changed my course, and I said, while we are looking for money for the standard gauge for Port Harcourt-Maiduguri, let me ask for money to reconstruct the narrow-gauge at $3.1 billion. And the President after much argument, accepted. After sometime, he agreed, that we can proceed with the narrow-gauge, while seeking money to construct the standard gauge”.
“At least, I’m sure that before we leave government, we would have done up to 80 per cent of that rail line. Also, there was no line to Owerri, I added Owerri to the Port Harcourt-Maiduguri rail design, because of the Industrial Park and the University of Transportation in Ubima,” Amaechi added.
-
World News6 days ago
Biden says ‘nobody can reverse’ his climate agenda. But Trump is poised to try.
-
Gist3 days ago
VIDEO: Congo’s president daughter’s bedroom video leaks
-
News7 days ago
Delta Assembly Approves Name Change for University of Science and Technology, Ozoro
-
News7 days ago
TrackNews Felicitates New NUJ Bayelsa State Exco
-
News5 days ago
NIMASA DG JOB: Gbajabiamila Allegedly Collected $1m Bribe From Victor Ochei, Others Paid $2m, $3m, Tinubu’s Man Akinyelure Fingered, ONI-Okpaku Arrested ___Jackson Ude
-
Politics3 days ago
Patani stands still as High Chief (Dr) Wayles honors his mother, remembering her legacy 5 years later.
-
Sports7 days ago
Ademola Lookman adds to Super Eagles withdrawals
-
Business6 days ago
JUST-IN: Auditor-General uncovers N3.4trn fraud